top of page

Circular Bricks From Demolition Waste | Development Connects Working Concept

Oct 29
2 min read

DECISION PROPOSITION

This executive concept for SBE Montréal 2027 proposes a focused study or demonstration in Dhaka North, Bangladesh, working with Waste-picker collectives, small builders and 100 neighbouring households. Combine image-based source classification, portable material testing, binder optimisation and cradle-to-gate life-cycle accounting against conventional local bricks.

EVIDENCE AND THE DECISION GAP

Sustainable built environment work increasingly considers embodied material impacts in addition to building operations. FAO’s global food-loss statistics exemplify the larger resource-efficiency challenge, while climate adaptation studies point to affordable durable infrastructure. Climate-resilient construction has to balance operational performance, embodied impact, affordability and hazard exposure across a full asset life.

PROPOSED PILOT AND EVALUATION

Develop a traceable supply chain for sorted demolition fines used in non-load-bearing blocks. Collect 120 representative waste loads, manufacture 500 laboratory blocks, perform strength, leachate and durability tests, and assess 100 households near processing sites for dust concerns. The outcome is a tested formulation, not permission to build housing. Main analyses would pre-specify sample-selection rules, source-variable definitions and minimum acceptable data quality.

PEOPLE, RIGHTS AND DATA SAFEGUARDS

Waste-picker cooperatives price sorting labour and jointly write health controls. Builder associations and municipal engineers evaluate procurement specifications; nearby residents can stop unacceptable dust-generating tests. Participation is built into problem framing, baseline instrument choice, governance of data, interpretation and presentation of findings. A simple local-language explanation of consent, an accessible grievance route and an independently chaired meeting must precede enrolment. Individuals can refuse digital collection without losing a service, wage or entitlement.

INDICATIVE INVESTMENT AND SCHEDULE

The scenario is US$115,000 proposed research/pilot cost. Itemised estimate: Materials and lab $39k; sorting wages $20k; field monitoring $12k; LCA $14k; public workshops $8k; quality inspection $12k; contingency $10k. Months 1–3: permissions, geotechnical/material/urban baseline and community design; months 4–8: simulations and limited pilots; months 9–12: safety testing, life-cycle analysis and independent review.

EVIDENCE NEEDED BEFORE SCALING

Planned outputs: 120 traced loads, 500 tested blocks, two vetted formulations and an occupational-safety protocol. Screen for ≥15% lower embodied CO2e per compliant block with no reduction in minimum strength. The design aims to make climate resilience a measurable building-service property instead of a marketing label. Possible benefits include stronger local decision-making, better technical literacy, and lower exclusion or evidence error; they are conditional hypotheses, not assured impacts. No sale or structural deployment until legal waste classification, chemical tests and applicable construction standards are passed.

PARTNERSHIP INVITATION

Development Connects invites expressions of interest from municipal construction-demolition waste agencies, materials testing labs, brick producers, architects and circular-economy investors. Proposed roles include site access, technical co-design, independent validation, ethical oversight and possible co-financing. These are potential collaborators, not confirmed project partners. The proposal is open for research partnership and budgetary support, subject to eligibility, due diligence and a signed workplan.

STATUS OF THE CONCEPT

Working concept | Development Connects | October 2026. No field pilot, funded award, institutional endorsement or verified impact is claimed. Participant counts, budgets and performance thresholds are indicative planning assumptions. Call type: Conference / research • Deadline: Verify current portal. Eligibility / caution: Conference submission; field research budget is hypothetical institutional/co-funding requirement, not organiser funding.

ORIGINAL OPPORTUNITY AND SELECTED REFERENCES

Original opportunity: SBE Montréal 2027. Call link: https://www.morressier.com/call-for-abstracts/SBE27-MONTREAL. Supporting research: https://www.unep.org/en/publications/report/adaptation-gap-report-2025 ; https://www.fao.org/policy-support/policy-themes/food-loss-and-food-waste/fao-policy-series--food-loss---food-waste/en.

Comments


Connect with us at Ranchi, Kolkata & Imphal

​Mobile : ​8292385665 ;  Email : info@dcdt.net

  • s-facebook
  • Twitter Metallic
  • s-linkedin
bottom of page